Ballina (YBNA)
Future Procedure
This page documents future procedures that are scheduled to be introduced on 09 July 2026.
Controllers are strongly encouraged to familiarise themselves with the incoming changes before launch day.
Positions
| Name | Callsign | Frequency | Login ID |
|---|---|---|---|
| Ballina ADC | Ballina Tower | 124.200 | BA_TWR |
| Ballina ATIS | 128.650 | YBNA_ATIS |
Airspace
BA ADC is responsible for the Class D airspace in the BA CTR from SFC to A015.
Refer to Class D Tower Separation Standards for more information.
SID Selection
Aircraft planned via IDNER and Non-Jet Aircraft planned via BUVAM shall be assigned the Procedural SID that terminates at the appropriate SID terminus. The BUVAM SID is not available when the M641 Evans Head MOA is active.
All other aircraft shall be assigned either the RADAR SID, or a visual departure.
Runway Modes
Circuits
| Runway | Day | Night |
|---|---|---|
| 06 | Left | - |
| 24 | Left | Right |
Circuits to be flown at A010.
Coordination
Auto Release
Next coordination is not required to BAA for aircraft that are:
- Departing from a runway nominated on the ATIS; and
- Assigned the standard assignable level; and
- Assigned a Procedural SID
All other aircraft require a 'Next' call to BAA.
The Standard Assignable level from BA ADC to BAA is:
| Aircraft | Level |
|---|---|
| All | The lower of A050 and RFL |
Arrivals/Overfliers
BAA will heads-up coordinate arrivals/overfliers from Class C to BA ADC prior to 5 mins from the boundary.
IFR aircraft will be cleared for the coordinated approach (Instrument or Visual) prior to handoff to BA ADC, unless BA ADC nominates a restriction.
VFR aircraft require a level readback.
Phraseology
BAA -> BA ADC: "via AVBAK for RNP-Y, QLK2035"
BA ADC -> BAA: "QLK2035, RNP-Y"
