Skip to content

4. WAMM to YPDN

Sector Responsibilities

Territory (TRT)

TRT is responsible for issuing STAR Clearances and all sequencing actions in to YPDN.

TRT will be responsible for the TRT subsector only.

STARs

All aircraft shall be issued the ANUPA1A STAR.

Sequencing

All aircraft must be instructed to cross ANUPA at 250 knots, then published STAR speeds.

Note

This instruction is not required for aircraft that have a clear gap in front of them in the sequence (>30nm).

Minimum distance between arrivals at handoff to DAW is 10nm (with no significant closing speed). It is important to try not to exceed 15nm, due to the large number of arrivals.

Coordination

WAAF CTR to TRT

As per Standard TRT coordination procedures, All aircraft should be Heads-up Coordinated by WAAF CTR prior to 30 mins from boundary.

Tip

It may be prudent (especially if they are using vatSys) to set up a Voiceless Coordination Agreement with WAAF CTR, in order to reduce workload for both controllers.

TRT to DAW

Standard as per TRT Local Instructions